Bale

Balinese · Ubud, Gianyar, Bali

Plate T.05

Balinese

Ubud · 8.5° S

Computed from the rules

5 m

The elevation, drawn from the model’s parts at its default rules.

Owner’s depa
1700 mm
Saka
12 (3 × 4)
Bataran
4.14 × 5.87 m
Ridge height
5.29 m
Ridge length
1.72 m
Pengurip
21.3 mm

A bale is one building in a Balinese house compound: a low masonry platform, a number of posts, and a hipped thatched roof, open on its sides. What makes it worth building here is not its form — it is the simplest object in this project — but the way it is measured. Under Asta Kosala Kosali every principal length is a whole number of a measure of its owner’s body, plus a pengurip so that it is never exact. The parts named on this screen — bale, bataran, saka, sendi, sunduk, jurai, alang-alang, murda — are Balinese and Indonesian words; where the author is not confident of the Balinese term, the part is named in Indonesian. The sun in this model is computed for Ubud, 8.51° S and 115.26° E.

Two shortfalls worth stating outright. First: a Balinese house is a walled compound of several bale around a natah, with a shrine in the kaja-kangin corner and a gate you have to turn to get past. This models one bale, not the compound — so the most distinctive thing about Balinese domestic building is precisely what is absent here. Second: there is no carving at all. Carving is not applied decoration on a Balinese building, so its absence is a real omission; but inventing plausible motifs from a vocabulary belonging to particular carvers would be worse than showing none. Beyond that, the ratios between one body measure and the next — how many hasta in a depa — are the author’s anthropometry, not figures from the Balinese literature.


Orientation

Orientation is set by the kaja–kelod axis: kaja toward the mountain, kelod toward the sea. It is not a compass direction, and that is what separates it from the other four houses here. In south Bali kaja is north; in north Bali kaja is south — the same rule gives opposite bearings depending on which side of the mountain you stand. This model is set for south Bali, so kaja falls toward −X. The tongkonan names an absolute bearing; the rumah gadang and the mbaru niang point at something outside themselves; this one points at something outside itself whose bearing changes with where you are. There is still no control that turns the building.


Provenance

Measured0
Canon10
Interpolated38

This bar moves as real surveys are wired in. That movement is the project's progress metric.


Ways to read this house