Uma

The Mentawai · Siberut, in the Mentawai Islands

Plate T.30

The Mentawai

Muara Siberut · 1.6° S

Computed from the rules

5 m

The elevation, drawn from the model’s parts at its default rules.

Households
5
Each share
2.90 m
Length
24.3 m
Verandas
2
Chiefs
0
Shared records
1

An uma on Siberut is a long house on ironwood posts: an open veranda at the front facing the river, a closed room with one hearth for each household, and a second veranda behind. Uma is also the name of the group that lives in it. There is no chief: the rimata leads ritual and does not command, and decisions are taken together on the front veranda. That is why this building is here — and it is also a difficulty that has to be said plainly, because a building that genuinely has no rank and a building whose rank nobody modelled are the same model. What can be checked is checked; the rest is stated. The second thing: the space is graded front to back like a Palembang rumah limas, but the grade follows what is being done rather than who is doing it. The sun in this model is computed for Muara Siberut, 1.6° S and 99.15° E: the second-westernmost site in the collection.

Carving and figures are a large part of a real uma and are not here: the jaraik is built as a plain board when the carving is the thing itself. Not modelled, for the reason the other packs give. Beyond that: the hearths here are ranged at an even spacing down the closed room, and real arrangements differ from uma to uma; the divisions of the front veranda and the rules attached to them are not built; the animal skulls on the jaraik are not modelled; and every metre here is the author’s reading of ethnographic description rather than a measurement. It should be added that much older writing about the Mentawai is wrong or demeaning, and that the Mentawai are living people rather than a comparison.


Orientation

Its front faces the river, because the river is the road. There is no compass rule: what sets the direction is the water’s edge. This model puts the front veranda at −Z and runs the ridge along that axis. There is still no control that turns the building.


Provenance

Measured0
Canon4
Interpolated27

This bar moves as real surveys are wired in. That movement is the project's progress metric.


Ways to read this house