Skip to content

Sources

Every dimension the house is generated from is below, with its class and its citation. This is the project’s honesty layer, and it is given a room of its own because a smooth 3D render implies a precision the sources do not have.


The dimensions

DimensionValueClassCitation
Length of one ruang along the ridge axis.ruangLength3.10 mIf 20% out: 3.10 mInterpolatedNo source
Depth of one lanjar, front to rear.lanjarDepth2.50 mIf 20% out: 1.50 mInterpolatedNo source
Number of lanjar. The sources name the lanjar as a division of the interior but do not fix a count for the ordinary house, so this number is the author’s.lanjarCount3If 20% out: 2.50 mInterpolatedNo source
Section of a tonggak, the underfloor post.postSection0.20 mMoves no measurementInterpolatedNo source
Height of the batu sandi a post stands on.padHeight0.25 mIf 20% out: 0.05 mInterpolatedNo source
Width of the batu sandi.padDiameter0.46 mMoves no measurementInterpolatedNo source
Clear underfloor height, from the ground to the floor frame.kolongHeight1.90 mIf 20% out: 0.38 mInterpolatedNo source
Height of the wall at its foot, from the deck to the wall plate.wallHeight2.10 mIf 20% out: 0.42 mInterpolatedNo source
Outward lean of the wall. The sources state that the body widens toward the plate; none gives the angle, so this figure is the author’s.wallLean8°If 20% out: 0.06 mInterpolatedNo source
Depth of a rasuak, the floor-frame beam.floorFrameDepth0.26 mIf 20% out: 0.05 mInterpolatedNo source
Thickness of a floor board.deckThickness0.05 mIf 20% out: 0.01 mInterpolatedNo source
Width of one floor board.deckBoardWidth0.26 mMoves no measurementInterpolatedNo source
Thickness of a wall board and of a bilik partition.wallThickness0.06 mMoves no measurementInterpolatedNo source
How far the anjuang floor steps up above the main floor. That the step exists is canon; how high it is, is not.anjuangRise0.42 mIf 20% out: 0.08 mInterpolatedNo source
Height of the ridge above the wall plate, at mid-span.ridgeRise3.20 mIf 20% out: 0.64 mInterpolatedNo source
How far the ridge line sags at mid-span relative to its ends.ridgeSag0.42 mIf 20% out: 0.08 mInterpolatedNo source
Rise of both ends of the ridge. Symmetric: unlike the tongkonan, neither end is the higher one.ridgeEndRise0.50 mIf 20% out: 0.10 mInterpolatedNo source
How far the roof projects beyond the end of the body. This is where the gonjong lives, so the projection is deep: the roof edge has already left the house before it starts to climb, which is why the long façade still reads as a straight eave.ridgeOverhang2.60 mMoves no measurementInterpolatedNo source
How far the ridge curve overshoots its control point before rising to the end; this is what makes the ridge a curve rather than a kink.ridgeUpsweep0.20Moves no measurementInterpolatedNo source
Height of a gonjong tip above the end of the ridge. The tips stand well above the ridge end, and the hollow between a pair of them is the most recognisable part of the silhouette.gonjongRise2.60 mMoves no measurementInterpolatedNo source
Where a gonjong tip stands across the roof, as a share of its half-width. A pair stands wide — footed at the roof edge and leaning inward toward the tips — so the separation is a property of how wide the roof is rather than a length of its own. The author’s reading of the form; no source gives the figure.gonjongSplay0.58Moves no measurementInterpolatedNo source
How far the lift reaches back into the body, as a share of its half-length. Nearly all the curve happens outside the house; it encroaches slightly so the transition is not a crease on the gable line. A large value lifts the edge too early, so the roof has flattened to ridge height before it reaches the end wall and there is no gable left.gonjongReach0.12Moves no measurementInterpolatedNo source
How late the roof edge turns upward into the gonjong. A value of one lifts it in a straight line from the end of the body; a high value holds the eave level and then raises it sharply near the tip.gonjongSweep2.20Moves no measurementInterpolatedNo source
Section of the verge member at the tip relative to its foot. This is what makes the point a point rather than a cut-off stub.gonjongSparTaper0.25Moves no measurementInterpolatedNo source
Radius of the verge member that carries the gonjong out to its point.gonjongSparRadius0.06 mMoves no measurementInterpolatedNo source
How far the eave oversails the outer post line, so the drip falls clear.eaveOversail1.35 mIf 20% out: 0.27 mInterpolatedNo source
How far the eave hangs below the wall plate.eaveDrop0.90 mIf 20% out: 0.18 mInterpolatedNo source
Depth of the wall plate the rafters bear on.plateDepth0.24 mMoves no measurementInterpolatedNo source
Width of the wall plate.plateWidth0.16 mMoves no measurementInterpolatedNo source
Width of a rafter in section.rafterWidth0.07 mMoves no measurementInterpolatedNo source
Depth of a rafter in section.rafterDepth0.11 mMoves no measurementInterpolatedNo source
Number of rafters per ruang, per side.raftersPerRuang3Moves no measurementInterpolatedNo source
Rafters added beyond the per-ruang count, for the two projecting ends.raftersAtEnds4Moves no measurementInterpolatedNo source
Radius of the ridge beam.ridgeBeamRadius0.08 mMoves no measurementInterpolatedNo source
Radius of a bamboo purlin.purlinRadius0.04 mMoves no measurementInterpolatedNo source
Position of the upper purlin, as a share of the run from ridge to the roof break.purlinAboveKnee0.50Moves no measurementInterpolatedNo source
Position of the lower purlin, as a share of the run from the break to the eave.purlinBelowKnee0.55Moves no measurementInterpolatedNo source
How far the roof boarding sits above the rafter axis, as a share of rafter depth.sheathingOffset0.60Moves no measurementInterpolatedNo source
Clearance between the roof boarding and the first ijuk course.ijukBedClearance0.02 mMoves no measurementInterpolatedNo source
Exposed depth of one ijuk course.ijukCourseDepth0.32 mMoves no measurementInterpolatedNo source
How far a course stands proud of the one below it.ijukThickness0.10 mMoves no measurementInterpolatedNo source
The share of a course that the course above laps over.ijukLap0.40Moves no measurementInterpolatedNo source
Thickness of the singok, the triangular board closing the gable end.singokThickness0.05 mMoves no measurementInterpolatedNo source
Width of a rasuak, as a share of the post section.sillWidth0.90Moves no measurementInterpolatedNo source
Depth of the dish in the batu sandi that the post foot seats into, as a share of stone height.postSeat0.30Moves no measurementInterpolatedNo source
How far a post head runs up into the floor frame, as a share of frame depth.tenonRun0.70Moves no measurementInterpolatedNo source
Depth of the tested joint engagement, as a share of the smaller member.jointEngagement0.30Moves no measurementInterpolatedNo source
The front faces the halaman, with the rangkiang ranged across it. The rule is relational rather than a compass bearing — and this is where the rumah gadang differs from the tongkonan, which faces north.orientation0°Moves no measurementCanonNavis, A. A., Alam Terkembang Jadi Guru: Adat dan Kebudayaan Minangkabau (Grafiti Pers, Jakarta, 1984).
The ruang count is always odd: three, five, seven, nine.ruangIsOdd1Moves no measurementCanonNavis, A. A., Alam Terkembang Jadi Guru: Adat dan Kebudayaan Minangkabau (Grafiti Pers, Jakarta, 1984).
Under the Koto Piliang laras the floor at both ends is raised into anjuang; under Bodi Caniago the floor is one level plane. The difference in adat is legible as a difference in floor height.anjuangKotoPiliang1.00Moves no measurementCanonNavis, A. A., Alam Terkembang Jadi Guru: Adat dan Kebudayaan Minangkabau (Grafiti Pers, Jakarta, 1984).
The base form carries four gonjong: one at each corner of the roof, where the eave lifts into a point.gonjongBase4Moves no measurementCanonDepartemen Pendidikan dan Kebudayaan, Arsitektur Tradisional Daerah Sumatera Barat (Proyek Inventarisasi dan Dokumentasi Kebudayaan Daerah, Jakarta).
A bilik is added as each daughter marries; their number is a record of how the matriline has grown.bilikAreTally1Moves no measurementCanonWaterson, R., The Living House: An Anthropology of Architecture in South-East Asia (Oxford University Press, Singapore, 1990).
The bilik fill sequentially from one end with no gaps. That they are added one at a time is canon; the direction of fill and the absence of gaps are the author’s, and they are why this house is not symmetric in its partitions.bilikFillOrder1.00Moves no measurementInterpolatedNo source
The body walls lean outward, widening toward the wall plate.wallsLeanOut1.00Moves no measurementCanonSchefold, R., Domenig, G. & Nas, P. (eds), Indonesian Houses Vol. 1: Tradition and Transformation in Vernacular Architecture (KITLV Press, Leiden, 2003).
Pegged joints; the frame goes up without nails.noNails1.00Moves no measurementCanonSchefold, R., Domenig, G. & Nas, P. (eds), Indonesian Houses Vol. 1: Tradition and Transformation in Vernacular Architecture (KITLV Press, Leiden, 2003).
The posts stand on the grid of ruang and lanjar, symmetric about the transverse mid-plane.postsOnGrid1Moves no measurementCanonDepartemen Pendidikan dan Kebudayaan, Arsitektur Tradisional Daerah Sumatera Barat (Proyek Inventarisasi dan Dokumentasi Kebudayaan Daerah, Jakarta).
The rangkiang stand across the halaman facing the rumah gadang. This house’s orientation constraint is relational rather than compass-bound — and these are what it is relative to, so without them the rule says nothing.rangkiangOpposite1Moves no measurementCanonNavis, A. A., Alam Terkembang Jadi Guru: Adat dan Kebudayaan Minangkabau (Grafiti Pers, Jakarta, 1984).
Width of the halaman between the house and the rangkiang.halamanDepth10.00 mMoves no measurementInterpolatedNo source
Plan side of one rangkiang. Only the footprint is drawn: the rangkiang are not modelled, and that is already stated as an absence.rangkiangPlan2.60 mMoves no measurementInterpolatedNo source
Height of the rangkiang floor above the ground. Only its massing is drawn; every figure here is the author’s.rangkiangFloorY1.90 mMoves no measurementInterpolatedNo source
Height of the rangkiang body.rangkiangBodyHeight1.60 mMoves no measurementInterpolatedNo source
Rise of the rangkiang roof above its body. A rangkiang’s roof carries gonjong like the house; this massing is a straight gable and states none.rangkiangRoofRise3.40 mMoves no measurementInterpolatedNo source
Side of a rangkiang post.rangkiangPostWidth0.26 mMoves no measurementInterpolatedNo source
Overhang of the rangkiang roof beyond its body, on the massing drawn here.rangkiangEave1.00 mMoves no measurementInterpolatedNo source
Spacing between rangkiang along the halaman.rangkiangSpacing5.00 mMoves no measurementInterpolatedNo source

Bibliography

  • navis-1984 · ethnography

    Navis, A. A., Alam Terkembang Jadi Guru: Adat dan Kebudayaan Minangkabau (Grafiti Pers, Jakarta, 1984).

  • vellinga-2004 · ethnography

    Vellinga, M., Constituting Unity and Difference: Vernacular Architecture in a Minangkabau Village (KITLV Press, Leiden, 2004).

  • schefold-2003 · reference

    Schefold, R., Domenig, G. & Nas, P. (eds), Indonesian Houses Vol. 1: Tradition and Transformation in Vernacular Architecture (KITLV Press, Leiden, 2003).

  • waterson-1990 · ethnography

    Waterson, R., The Living House: An Anthropology of Architecture in South-East Asia (Oxford University Press, Singapore, 1990).

  • depdikbud-sumbar · reference

    Departemen Pendidikan dan Kebudayaan, Arsitektur Tradisional Daerah Sumatera Barat (Proyek Inventarisasi dan Dokumentasi Kebudayaan Daerah, Jakarta).


Which of these matters most

Nearly every dimension on this page is the author’s own. What the provenance bar does not say is whether that matters. Each row below is computed by rebuilding the house: one dimension is pushed 20%, and the house is measured to see how far it follows. Nothing is estimated — the figures are the difference between two runs of the generator.

  1. 1ruangLength3.10 mbody length
  2. 2lanjarCount2.50 mbody depth
  3. 3lanjarDepth1.50 mbody depth
  4. 4ridgeRise0.64 mridge height
  5. 5wallHeight0.42 meave height
  6. 6kolongHeight0.38 mridge height
  7. 7eaveOversail0.27 mroof reach
  8. 8eaveDrop0.18 meave height

If only one dimension could be surveyed, this is the one. This is sensitivity, not uncertainty: it shows what moves, not how likely the value is to be wrong. The 20% is itself the author’s choice.


Invariants

There is no measured drawing yet, so correctness rests on structural truth. These checks fail the build.

  • pass
    Bilateral symmetry about the transverse mid-plane

    22967 points (257 of 263 parts); largest mirror deviation 0.00 mm.

  • pass
    Every tenon contained in its mortise

    70 pasak, takik and tumpu joints; every one engaged.

  • pass
    No joint spans more than one stage

    Every joint engages two parts from the same stage or from consecutive ones.

  • pass
    Stage ordering, and nothing below ground

    263 parts, every one bearing on something already standing or on the ground.

  • pass
    Mesh integrity: indices, triangles, normals

    32272 triangles; indices in range, none degenerate, every normal unit length.

  • pass
    The ruang count is odd

    5 ruang; 6 ruang boundaries.

  • pass
    The ridge sags in the interior; both ends rise to the same height

    lowest point at s=0.50 (7.34 m); the two ends at 8.26 m and 8.26 m.

  • pass
    Koto Piliang: the floor at both ends rises into anjuang

    main floor 2.46 m, anjuang floor 2.88 m; a step of 0.42 m over 24 boards.

  • pass
    The gonjong are part of the roof, not masts standing on it

    4 gonjong; highest tip 10.86 m against a ridge end of 8.26 m; the roof reaches every tip within 0.07 m.

  • pass
    The roof edge holds its line, then climbs past the ridge into the gonjong

    level at 3.66 m as far as z=6.82 m, then rising 7.20 m over 3.53 m — a slope of 2.0 : 1 — to 10.86 m, past the ridge end at 8.26 m, narrowing to 3.13 m.

  • pass
    Nothing in the roof frame reaches outside the roof

    78 rafters and gable panels cut to the roof section they sit at; the furthest reaches 35 mm outboard and 54 mm low.

  • pass
    The bilik fill the rear lanjar in sequence, with no gaps

    3 bilik out of 3 interior ruang; consecutive, one ruang wide each.

  • pass
    The walls lean outward; the body widens as it rises

    wall foot 3.75 m from the axis, head 4.05 m; the outermost board reaches 4.07 m at 8°.

  • pass
    Ijuk courses lap with no bare strip; the ridge is covered

    35 courses; smallest lap 2.3% of the slope run.

  • pass
    The eave oversails the outer post line

    eave 5.40 m from the axis; outer post face 3.75 m; oversail 1.65 m.

  • pass
    The eave clears the wall plate

    roof at x=4.05 m sits at 4.68 m; top of the wall plate 4.68 m; eave 5.40 m.

  • pass
    Post count follows the ruang and lanjar counts

    5 ruang × 3 lanjar → 6 × 4 = 24 posts, 24 pad stones.

  • pass
    Every part declares the dimensions it came from

    263 parts, every one tagged. By least-sourced input: 0 measured, 0 canon, 263 interpolated.

  • skipped
    Checked against a measured drawing of a real house

    Skipped. No measured drawing has been wired in, so there is nothing to compare against. This check will not be made to pass by weakening it.


What a check is preventing

Ten green rows are not a reason to believe anything. So one check is run against a house built to break it, and what is printed below is that check’s own verdict rather than a description of it.

This check enforces the one claim in this pack that a reader standing in the room could disprove with a spirit level: under the Koto Piliang laras, the floor at both ends stands above the middle. Flatten the step and the house stops being able to say which adat raised it. The threshold is searched rather than picked — and the step stops being a step before it reaches zero, at the point where it is thinner than the board that forms it.

The house as built

pass2.46 m / 2.88 mmain floor · anjuang floor

main floor 2.46 m, anjuang floor 2.88 m; a step of 0.42 m over 24 boards.

Rear prow raised to 0.04 m

fail2.46 m / 2.50 mmain floor · anjuang floor

No anjuang was built. The step of 0.042 m is thinner than the 0.050 m floor board that would form it, so there is nothing to stand on.

The second house is never rendered. It is built during the build, failed, and thrown away.


This bar moves as real surveys are wired in. That movement is the project's progress metric.